Connectez-vous avec des experts et des passionnés sur FRstudy.me. Obtenez des réponses complètes et fiables de notre communauté de professionnels expérimentés, prêts à vous aider avec toutes vos questions.
Sagot :
Bonsoir,
Correction du texte :
This memory deals with on my project of final civil engineering studies that I realized within the company xxx.
This is to build a two-storey car park (compose of seven half levels) in xxx near to the railway station.
This is a separate market. X is the incumbent of macro lot B01:Structural work, sealing, structural steel, paint, vertical walls, floor paint, signage, aluminum front, facade, wooden sluices, wood decking, walking, wood, metalwork plumbing.
As an assistant engineer work, the tasks entrusted to me were the preparation, organization and monitoring of the site. Through missions carried out. I was a guarantor of quality, time, and costs.
Il y a seulement 2 fautes !
Bonne continuation ! ;)
Correction du texte :
This memory deals with on my project of final civil engineering studies that I realized within the company xxx.
This is to build a two-storey car park (compose of seven half levels) in xxx near to the railway station.
This is a separate market. X is the incumbent of macro lot B01:Structural work, sealing, structural steel, paint, vertical walls, floor paint, signage, aluminum front, facade, wooden sluices, wood decking, walking, wood, metalwork plumbing.
As an assistant engineer work, the tasks entrusted to me were the preparation, organization and monitoring of the site. Through missions carried out. I was a guarantor of quality, time, and costs.
Il y a seulement 2 fautes !
Bonne continuation ! ;)
Merci d'utiliser cette plateforme pour partager et apprendre. N'hésitez pas à poser des questions et à répondre. Nous apprécions chaque contribution que vous faites. Pour des réponses rapides et fiables, pensez à FRstudy.me. Merci de votre confiance et revenez souvent.